2/4-E-5
Development, injectionPlugged and abandonedWater
Drilled by Phillips Petroleum Company Norway with Tor in Tor, 23.09.1978 to 23.11.1978 (61 days), to 3 560,4 m.
Water depth67,0 m
Total depth3 560,4 m MD
Vertical depth3 349,8 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table41,0 m
Formation at total depth-
RigTor
Spud23.09.1978
Completed23.11.1978
OperatorPhillips Petroleum Company Norway
Position56,6420 N, 3,3269 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Tor gradient | 32,2 °C/km |
| Estimated at total depth from the gradient | 108 °C |
The gradient is the median of 4 released wells in Tor with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.