2/4-K-18
Development, injectionPluggedWater
Drilled by Phillips Petroleum Company Norway with Ekofisk K in Ekofisk, 17.01.1992 to 14.04.1992 (88 days), to 4 100,0 m.
Water depth71,0 m
Total depth4 100,0 m MD
Vertical depth3 744,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table57,0 m
Formation at total depth-
RigEkofisk K
Spud17.01.1992
Completed14.04.1992
OperatorPhillips Petroleum Company Norway
Position56,5655 N, 3,2062 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Ekofisk gradient | 38,0 °C/km |
| Estimated at total depth from the gradient | 142 °C |
The gradient is the median of 6 released wells in Ekofisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/4-K-18 A same well | 0,0 | 5 121,0 | - | - | 2013 |
| 2/4-K-18 AY2 same well | 0,0 | 5 340,0 | - | - | 2023 |
| 2/4-K-28 | 0,0 | 3 782,0 | - | - | 1987 |
| 2/4-K-28 A | 0,0 | 4 225,0 | - | - | 2010 |
| 2/4-K-28 AY2 | 0,0 | 4 549,0 | - | - | 2023 |
| 2/4-K-28 AY3 | 0,0 | 4 525,0 | - | - | 2023 |
| 2/4-K-8 | 0,0 | 4 956,0 | - | - | 1989 |
| 2/4-K-8 A | 0,0 | 4 893,0 | - | - | 1995 |
Casing and formation tests
No casing programme is reported for this wellbore.