2/4-K-2
Development, injectionPluggedWater
Drilled by Phillips Petroleum Company Norway with Dyvi Beta in Ekofisk, 11.08.1989 to 13.09.1990 (398 days), to 5 111,5 m.
Water depth71,0 m
Total depth5 111,5 m MD
Vertical depth3 519,5 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table57,0 m
Formation at total depth-
RigDyvi Beta
Spud11.08.1989
Completed13.09.1990
OperatorPhillips Petroleum Company Norway
Position56,5656 N, 3,2065 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Ekofisk gradient | 38,0 °C/km |
| Estimated at total depth from the gradient | 133 °C |
The gradient is the median of 6 released wells in Ekofisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/4-K-2 A same well | 0,0 | 4 944,0 | - | - | 2020 |
| 2/4-K-1 | 0,0 | 4 830,0 | - | - | 1989 |
| 2/4-K-1 A | 0,0 | 3 475,0 | - | - | 2012 |
| 2/4-K-12 | 0,0 | 3 780,0 | - | - | 1985 |
| 2/4-K-12 A | 0,0 | 5 197,0 | - | - | 2012 |
| 2/4-K-3 | 0,0 | 6 585,0 | - | - | 1995 |
| 2/4-K-13 | 0,0 | 3 355,0 | - | - | 1984 |
| 2/4-K-13 A | 0,0 | 3 944,0 | - | - | 2013 |
Casing and formation tests
No casing programme is reported for this wellbore.