2/4-K-6 B
Development, injectionInjectingWater
Drilled by ConocoPhillips Skandinavia AS with Ekofisk K in Ekofisk, 09.11.2008 to 19.12.2008 (40 days), to 4 028,0 m.
Water depth71,0 m
Total depth4 028,0 m MD
Vertical depth3 324,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table55,0 m
Formation at total depth-
RigEkofisk K
Spud09.11.2008
Completed19.12.2008
OperatorConocoPhillips Skandinavia AS
Position56,5655 N, 3,2063 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Ekofisk gradient | 38,0 °C/km |
| Estimated at total depth from the gradient | 126 °C |
The gradient is the median of 6 released wells in Ekofisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.