2/4-M-17
Development, productionPluggedOil
Drilled by ConocoPhillips Skandinavia AS with Mærsk Gallant in Ekofisk, 19.01.2005 to 14.02.2005 (26 days), to 4 107,0 m.
Water depth78,0 m
Total depth4 107,0 m MD
Vertical depth3 371,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table58,0 m
Formation at total depth-
RigMærsk Gallant
Spud19.01.2005
Completed14.02.2005
OperatorConocoPhillips Skandinavia AS
Position56,5454 N, 3,2232 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Ekofisk gradient | 38,0 °C/km |
| Estimated at total depth from the gradient | 127 °C |
The gradient is the median of 6 released wells in Ekofisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/4-M-22 | 0,0 | 3 596,0 | - | - | 2005 |
| 2/4-M-22 A | 0,0 | 7 329,0 | - | - | 2015 |
| 2/4-M-18 | 0,0 | 3 825,0 | - | - | 2004 |
| 2/4-M-16 | 0,0 | 4 573,0 | - | - | 2006 |
| 2/4-M-21 | 0,0 | 3 676,0 | - | - | 2005 |
| 2/4-M-21 A | 0,0 | 6 435,0 | - | - | 2015 |
| 2/4-M-23 | 0,0 | 4 054,0 | - | - | 2005 |
| 2/4-M-19 | 0,0 | 4 191,0 | - | - | 2007 |
Casing and formation tests
No casing programme is reported for this wellbore.