WellplannerNorwegian shelf well data

Fields / 2/4-U-38

2/4-U-38

Other, soil drillingPlugged and abandoned

Drilled by Phillips Petroleum Company Norway with Bucentaur, 23.06.1994 to 25.06.1994 (2 days), to 180,0 m.

Water depth77,0 m
Total depth180,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table2,9 m
Formation at total depth-
RigBucentaur
Spud23.06.1994
Completed25.06.1994
OperatorPhillips Petroleum Company Norway
Position56,5476 N, 3,2194 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-

The wellbore is not in a field, so no field gradient applies.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
2/4-X-300,03 679,0--2005
2/4-X-30 A0,04 890,0--2022
2/4-X-340,04 363,2--1998
2/4-X-34 A0,05 004,0--2007
2/4-X-380,03 073,6--1996
2/4-X-38 A0,03 997,0--2012
2/4-X-38 B0,04 013,0--2012
2/4-X-38 C0,05 208,0--2021

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗