Fields / 2/4-U-38
2/4-U-38
Other, soil drillingPlugged and abandoned
Drilled by Phillips Petroleum Company Norway with Bucentaur, 23.06.1994 to 25.06.1994 (2 days), to 180,0 m.
Water depth77,0 m
Total depth180,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table2,9 m
Formation at total depth-
RigBucentaur
Spud23.06.1994
Completed25.06.1994
OperatorPhillips Petroleum Company Norway
Position56,5476 N, 3,2194 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/4-X-30 | 0,0 | 3 679,0 | - | - | 2005 |
| 2/4-X-30 A | 0,0 | 4 890,0 | - | - | 2022 |
| 2/4-X-34 | 0,0 | 4 363,2 | - | - | 1998 |
| 2/4-X-34 A | 0,0 | 5 004,0 | - | - | 2007 |
| 2/4-X-38 | 0,0 | 3 073,6 | - | - | 1996 |
| 2/4-X-38 A | 0,0 | 3 997,0 | - | - | 2012 |
| 2/4-X-38 B | 0,0 | 4 013,0 | - | - | 2012 |
| 2/4-X-38 C | 0,0 | 5 208,0 | - | - | 2021 |
Casing and formation tests
No casing programme is reported for this wellbore.