Fields / 2/4-U-41
2/4-U-41
Other, soil drillingPlugged and abandoned
Drilled by Phillips Petroleum Company Norway with Bucentaur, 05.07.1994 to 06.07.1994 (1 days), to 163,0 m.
Water depth77,0 m
Total depth163,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table2,9 m
Formation at total depth-
RigBucentaur
Spud05.07.1994
Completed06.07.1994
OperatorPhillips Petroleum Company Norway
Position56,5487 N, 3,2197 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/4-U-39 | 0,0 | 180,0 | - | - | 1994 |
| 2/4-U-40 | 0,1 | 168,0 | - | - | 1994 |
| 2/4-X-50 | 0,1 | 5 244,0 | - | - | 2003 |
| 2/4-X-49 | 0,1 | 5 619,0 | - | - | 2002 |
| 2/4-X-48 | 0,1 | 5 304,0 | - | - | 2001 |
| 2/4-X-47 | 0,1 | 5 101,4 | - | - | 1997 |
| 2/4-X-47 A | 0,1 | 4 870,0 | - | - | 2018 |
| 2/4-X-47 AY2 | 0,1 | 4 869,5 | - | - | 2025 |
Casing and formation tests
No casing programme is reported for this wellbore.