Fields / 2/4-U-49
2/4-U-49
Other, soil drillingPlugged and abandoned
Drilled by Phillips Petroleum Company Norway with Bucentaur, 11.02.1996 to 12.02.1996 (1 days), to 102,0 m.
Water depth71,0 m
Total depth102,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table2,9 m
Formation at total depth-
RigBucentaur
Spud11.02.1996
Completed12.02.1996
OperatorPhillips Petroleum Company Norway
Position56,4904 N, 3,3302 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/7-14 | 5,9 | 3 390,0 | 124 °C | 1,68 | 1979 |
| 2/7-14 R | 5,9 | 3 387,0 | - | - | 1989 |
| 2/4-U-60 | 6,3 | 109,4 | - | - | 2017 |
| 2/4-VC-1 H | 6,3 | 4 659,0 | - | - | 2018 |
| 2/4-VC-3 H | 6,3 | 4 652,0 | - | - | 2018 |
| 2/4-VC-2 H | 6,3 | 5 019,0 | - | - | 2018 |
| 2/4-VC-2 Y2H | 6,3 | 5 347,0 | - | - | 2018 |
| 2/4-VC-2 Y3H | 6,3 | 5 468,0 | - | - | 2018 |
Casing and formation tests
No casing programme is reported for this wellbore.