Fields / 2/4-U-53
2/4-U-53
Other, soil drillingPlugged and abandoned
Drilled by Phillips Petroleum Company Norway with Bucentaur, 13.09.2002 to 13.09.2002 (0 days), to 109,0 m.
Water depth79,0 m
Total depth109,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table2,9 m
Formation at total depth-
RigBucentaur
Spud13.09.2002
Completed13.09.2002
OperatorPhillips Petroleum Company Norway
Position56,5453 N, 3,2236 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/4-M-30 | 0,0 | 4 914,0 | - | - | 2007 |
| 2/4-M-29 | 0,0 | 5 084,0 | - | - | 2007 |
| 2/4-M-29 A | 0,0 | 5 221,0 | - | - | 2009 |
| 2/4-M-25 | 0,0 | 4 627,0 | - | - | 2006 |
| 2/4-M-25 A | 0,0 | 4 572,0 | - | - | 2007 |
| 2/4-M-28 | 0,0 | 5 163,0 | - | - | 2007 |
| 2/4-M-28 A | 0,0 | 5 203,0 | - | - | 2014 |
| 2/4-M-24 | 0,0 | 4 038,0 | - | - | 2005 |
Casing and formation tests
No casing programme is reported for this wellbore.