Fields / 2/4-U-66
2/4-U-66
Other, soil drillingPlugged
Drilled by ConocoPhillips Skandinavia AS with Fugro Scout, 15.07.2018 to 15.07.2018 (0 days), to 107,5 m.
Water depth67,7 m
Total depth107,5 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table-
Formation at total depth-
RigFugro Scout
Spud15.07.2018
Completed15.07.2018
OperatorConocoPhillips Skandinavia AS
Position56,6432 N, 3,3060 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/4-U-65 | 0,2 | 101,8 | - | - | 2018 |
| 2/4-U-63 | 0,3 | 108,3 | - | - | 2018 |
| 2/4-U-64 | 0,3 | 107,7 | - | - | 2018 |
| 2/4-YB-1 AH | 0,3 | - | - | - | - |
| 2/4-YB-1 H | 0,3 | 4 737,0 | - | - | 2020 |
| 2/4-YB-3 H | 0,3 | 4 373,0 | - | - | 2021 |
| 2/4-U-62 | 0,3 | 77,8 | - | - | 2018 |
| 2/4-YB-2 AH | 0,3 | 5 283,0 | - | - | 2020 |
Casing and formation tests
No casing programme is reported for this wellbore.