2/4-VA-2 H
Development, injectionInjectingWater
Drilled by ConocoPhillips Skandinavia AS with Mærsk Innovator in Ekofisk, 05.07.2009 to 29.08.2009 (55 days), to 3 577,0 m.
Water depth78,6 m
Total depth3 577,0 m MD
Vertical depth3 336,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table50,2 m
Formation at total depth-
RigMærsk Innovator
Spud05.07.2009
Completed29.08.2009
OperatorConocoPhillips Skandinavia AS
Position56,5369 N, 3,2120 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Ekofisk gradient | 38,0 °C/km |
| Estimated at total depth from the gradient | 126 °C |
The gradient is the median of 6 released wells in Ekofisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/4-VA-6 H | 0,0 | 4 324,0 | - | - | 2009 |
| 2/4-VA-4 H | 0,0 | 3 741,0 | - | - | 2009 |
| 2/4-VA-8 H | 0,0 | 4 407,0 | - | - | 2009 |
| 2/4-VA-5 H | 0,0 | 3 840,0 | - | - | 2009 |
| 2/4-VA-1 H | 0,0 | 4 054,0 | - | - | 2009 |
| 2/4-VA-3 H | 0,0 | 4 541,0 | - | - | 2009 |
| 2/4-VA-7 H | 0,0 | 5 897,0 | - | - | 2010 |
| 2/4-U-29 | 0,0 | 119,0 | - | - | 2008 |
Casing and formation tests
No casing programme is reported for this wellbore.