2/4-VB-4 H
Development, injectionInjectingWater
Drilled by ConocoPhillips Skandinavia AS with Mærsk Innovator in Ekofisk, 29.10.2013 to 24.11.2013 (26 days), to 5 346,0 m.
Water depth74,0 m
Total depth5 346,0 m MD
Vertical depth3 196,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table52,0 m
Formation at total depth-
RigMærsk Innovator
Spud29.10.2013
Completed24.11.2013
OperatorConocoPhillips Skandinavia AS
Position56,5205 N, 3,2392 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Ekofisk gradient | 38,0 °C/km |
| Estimated at total depth from the gradient | 121 °C |
The gradient is the median of 6 released wells in Ekofisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/4-VB-2 H | 0,0 | 5 334,0 | - | - | 2012 |
| 2/4-VB-6 H | 0,0 | 4 696,0 | - | - | 2012 |
| 2/4-VB-8 H | 0,0 | 5 327,0 | - | - | 2013 |
| 2/4-VB-3 H | 0,0 | 5 157,0 | - | - | 2012 |
| 2/4-VB-1 H | 0,0 | 5 212,0 | - | - | 2012 |
| 2/4-VB-5 H | 0,0 | 5 327,0 | - | - | 2012 |
| 2/4-VB-7 H | 0,0 | 5 513,0 | - | - | 2012 |
| 2/4-U-8 | 0,0 | 111,0 | - | - | 2009 |
Casing and formation tests
No casing programme is reported for this wellbore.