2/4-X-2 A
Development, productionPluggedOil
Drilled by Phillips Petroleum Company Norway with Mærsk Gallant in Ekofisk, 12.05.1998 to 22.05.1998 (10 days), to 4 387,9 m.
Water depth76,0 m
Total depth4 387,9 m MD
Vertical depth3 170,8 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table66,0 m
Formation at total depth-
RigMærsk Gallant
Spud12.05.1998
Completed22.05.1998
OperatorPhillips Petroleum Company Norway
Position56,5475 N, 3,2189 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Ekofisk gradient | 38,0 °C/km |
| Estimated at total depth from the gradient | 119 °C |
The gradient is the median of 6 released wells in Ekofisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.