2/4-X-21 A
Development, productionProducingOil
Drilled by ConocoPhillips Skandinavia AS with Ekofisk X in Ekofisk, 25.03.2024 to 06.06.2024 (73 days), to 5 318,8 m.
Water depth76,0 m
Total depth5 318,8 m MD
Vertical depth3 214,4 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table57,3 m
Formation at total depth-
RigEkofisk X
Spud25.03.2024
Completed06.06.2024
OperatorConocoPhillips Skandinavia AS
Position56,5476 N, 3,2189 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Ekofisk gradient | 38,0 °C/km |
| Estimated at total depth from the gradient | 121 °C |
The gradient is the median of 6 released wells in Ekofisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/4-X-21 Y1 same well | 0,0 | 5 720,0 | - | - | 2004 |
| 2/4-X-21 Y2 same well | 0,0 | 5 413,0 | - | - | 2004 |
| 2/4-X-22 | 0,0 | 3 804,0 | - | - | 2003 |
| 2/4-X-22 A | 0,0 | 6 328,0 | - | - | 2022 |
| 2/4-X-17 | 0,0 | 4 488,0 | - | - | 2001 |
| 2/4-X-17 A | 0,0 | 4 553,0 | - | - | 2017 |
| 2/4-X-18 | 0,0 | 4 990,0 | - | - | 2001 |
| 2/4-X-18 AY1 | 0,0 | 5 017,0 | - | - | 2018 |
Casing and formation tests
No casing programme is reported for this wellbore.