2/4-X-3
Development, productionPluggedOil
Drilled by Phillips Petroleum Company Norway with Mærsk Gallant in Ekofisk, 22.06.1997 to 15.09.1997 (85 days), to 7 356,0 m.
Water depth76,0 m
Total depth7 356,0 m MD
Vertical depth3 236,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table66,0 m
Formation at total depth-
RigMærsk Gallant
Spud22.06.1997
Completed15.09.1997
OperatorPhillips Petroleum Company Norway
Position56,5475 N, 3,2190 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Ekofisk gradient | 38,0 °C/km |
| Estimated at total depth from the gradient | 122 °C |
The gradient is the median of 6 released wells in Ekofisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.