2/4-X-9
Development, productionPluggedOil
Drilled by Phillips Petroleum Company Norway with Mærsk Gallant in Ekofisk, 05.04.1997 to 14.05.1997 (39 days), to 4 032,5 m.
Water depth76,0 m
Total depth4 032,5 m MD
Vertical depth3 341,2 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table66,0 m
Formation at total depth-
RigMærsk Gallant
Spud05.04.1997
Completed14.05.1997
OperatorPhillips Petroleum Company Norway
Position56,5475 N, 3,2189 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Ekofisk gradient | 38,0 °C/km |
| Estimated at total depth from the gradient | 126 °C |
The gradient is the median of 6 released wells in Ekofisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/4-X-9 A same well | 0,0 | 4 033,0 | - | - | 2010 |
| 2/4-X-5 | 0,0 | 4 492,4 | - | - | 1998 |
| 2/4-X-5 A | 0,0 | 4 454,0 | - | - | 2013 |
| 2/4-X-13 | 0,0 | 3 810,0 | - | - | 2002 |
| 2/4-X-13 A | 0,0 | 4 267,0 | - | - | 2004 |
| 2/4-X-14 | 0,0 | 3 584,0 | - | - | 2003 |
| 2/4-X-14 A | 0,0 | 5 710,0 | - | - | 2021 |
| 2/4-X-14 AY2 | 0,0 | 5 584,0 | - | - | 2025 |
Casing and formation tests
No casing programme is reported for this wellbore.