2/4-Z-28
Development, productionJunkedOil and gas
Drilled by ConocoPhillips Skandinavia AS with West Linus in Ekofisk, 09.12.2018 to 31.12.2019 (387 days), to 5 677,0 m.
Water depth79,3 m
Total depth5 677,0 m MD
Vertical depth3 130,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table79,2 m
Formation at total depth-
RigWest Linus
Spud09.12.2018
Completed31.12.2019
OperatorConocoPhillips Skandinavia AS
Position56,5444 N, 3,2268 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Ekofisk gradient | 38,0 °C/km |
| Estimated at total depth from the gradient | 117 °C |
The gradient is the median of 6 released wells in Ekofisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/4-Z-28 Y2 same well | 0,0 | 5 456,0 | - | - | 2020 |
| 2/4-Z-28 Y3 same well | 0,0 | - | - | - | - |
| 2/4-Z-28 Y4 same well | 0,0 | - | - | - | - |
| 2/4-Z-26 | 0,0 | 6 085,0 | - | - | 2016 |
| 2/4-Z-27 | 0,0 | 7 384,0 | - | - | 2016 |
| 2/4-Z-22 | 0,0 | 3 871,0 | - | - | 2014 |
| 2/4-Z-22 A | 0,0 | 4 620,0 | - | - | 2014 |
| 2/4-Z-34 | 0,0 | 6 805,0 | - | - | 2015 |
Casing and formation tests
No casing programme is reported for this wellbore.