2/5-1
Exploration, wildcatPlugged and abandonedOil
Drilled by Amoco Norway Oil Company with Orion in Tor, 01.08.1970 to 22.11.1970 (113 days), to 3 972,0 m in the Farsund Formation.
Formations
17 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 125 °C |
| Drill-stem test at 3 101,0 m | 121 °C |
| Tor gradient | 32,2 °C/km |
| Estimated at total depth from the gradient | 129 °C |
The gradient is the median of 4 released wells in Tor with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 127,0 | 36" | 128,0 | - |
| Surface casing | 20" | 378,0 | 26" | 378,0 | - |
| Intermediate | 13 3/8" | 1 591,0 | 17 1/2" | 1 601,0 | - |
| Intermediate | 9 5/8" | 3 045,0 | 12 1/4" | 3 055,0 | - |
| Production | 7" | 3 327,0 | 8 1/2" | 3 973,0 | - |
Mud weight
5 measurements, one dot each, 1,10 to 1,71 g/cm³ against measured depth, seawater, waterbased.
Drill-stem tests
Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.
| Test | Interval, m | Choke | Pressure | Temp. | Oil | Gas |
|---|---|---|---|---|---|---|
| 1 | 3 042,0 - 3 101,0 | - | 46,0 | 121 | 209 | 223 212 |
| 8 | 3 043,0 - 3 056,0 | - | - | - | 230 | 65 000 |
| 7 | 3 154,0 - 3 191,0 | - | 48,0 | - | 159 | 203 838 |
| 6 | 3 225,0 - 3 234,0 | - | - | - | 445 | - |
| 4 | 3 244,0 - 3 248,0 | - | - | - | 425 | 612 000 |
| 2 | 3 274,0 - 3 277,0 | - | - | - | - | - |
| 5 | 3 285,0 - 3 234,0 | - | - | - | 145 | - |