Fields / 2/5-U-2
2/5-U-2
Other, soil drillingPlugged and abandoned
Drilled by Lundin Norway AS with Bucentaur, 23.01.2008 to 23.01.2008 (0 days), to 104,0 m.
Water depth67,2 m
Total depth104,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table3,0 m
Formation at total depth-
RigBucentaur
Spud23.01.2008
Completed23.01.2008
OperatorLundin Norway AS
Position56,6068 N, 3,4329 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.