Fields / 2/6-3
2/6-3
Exploration, wildcatPlugged and abandonedDry
Drilled by Elf Petroleum Norge AS with Byford Dolphin, 09.11.1982 to 25.02.1983 (108 days), to 4 060,0 m in the Basement.
Water depth71,0 m
Total depth4 060,0 m MD
Vertical depth4 060,0 m TVD
Bottom-hole temperature134 °C
Max inclination-
Rotary table25,0 m
Formation at total depthBasement
RigByford Dolphin
Spud09.11.1982
Completed25.02.1983
OperatorElf Petroleum Norge AS
Position56,5304 N, 3,8237 E
Formations
21 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 134 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 155,0 | 36" | - | - |
| Surface casing | 20" | 793,0 | 26" | 803,0 | 1,75 LOT |
| Intermediate | 13 3/8" | 2 494,0 | 17 1/2" | 2 504,0 | 1,70 LOT |
| Intermediate | 9 5/8" | 3 435,0 | 12 1/4" | 3 449,0 | 1,95 LOT |
| Liner | 7" | 3 910,0 | 8 1/2" | 4 060,0 | - |
Mud weight
9 measurements, one dot each, 1,00 to 1,61 g/cm³ against measured depth, waterbased.