Fields / 2/7-12
2/7-12
Exploration, wildcatPlugged and abandonedShows
Drilled by Phillips Petroleum Company Norway with Dyvi Beta, 17.12.1978 to 30.01.1979 (44 days), to 1 832,0 m in the Zechstein Group.
Water depth75,0 m
Total depth1 832,0 m MD
Vertical depth-
Bottom-hole temperature88 °C
Max inclination-
Rotary table38,0 m
Formation at total depthZechstein Group
RigDyvi Beta
Spud17.12.1978
Completed30.01.1979
OperatorPhillips Petroleum Company Norway
Position56,4955 N, 3,0101 E
Formations
4 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 88 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 175,0 | 36" | 175,0 | - |
| Surface casing | 20" | 335,0 | 26" | 341,0 | 1,63 LOT |
| Intermediate | 13 3/8" | 1 402,0 | 17 1/2" | 1 412,0 | 1,66 LOT |
| Open hole | - | 1 832,0 | 12 1/4" | 1 832,0 | - |
Mud weight
5 measurements, one dot each, 1,00 to 1,78 g/cm³ against measured depth, waterbased.
Drill-stem tests
Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.
| Test | Interval, m | Choke | Pressure | Temp. | Oil | Gas |
|---|---|---|---|---|---|---|
| 1 | 417,0 - 426,0 | 25,4 | - | - | - | - |