2/7-A-14 A
Development, productionPluggedOil
Drilled by Phillips Petroleum Company Norway with Mærsk Gallant in Eldfisk, 13.10.1996 to 18.11.1996 (36 days), to 4 871,6 m.
Water depth71,0 m
Total depth4 871,6 m MD
Vertical depth2 897,1 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table51,0 m
Formation at total depth-
RigMærsk Gallant
Spud13.10.1996
Completed18.11.1996
OperatorPhillips Petroleum Company Norway
Position56,3768 N, 3,2660 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Eldfisk gradient | 34,0 °C/km |
| Estimated at total depth from the gradient | 98 °C |
The gradient is the median of 7 released wells in Eldfisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/7-A-14 same well | 0,0 | 4 311,4 | - | - | 1979 |
| 2/7-A-14 B same well | 0,0 | 4 938,0 | - | - | 2009 |
| 2/7-A-11 | 0,0 | 4 395,2 | - | - | 1979 |
| 2/7-A-15 | 0,0 | 5 614,0 | - | - | 1978 |
| 2/7-A-15 A | 0,0 | 4 938,0 | - | - | 2004 |
| 2/7-A-15 B | 0,0 | 5 393,0 | - | - | 2011 |
| 2/7-A-13 | 0,0 | 5 410,0 | - | - | 1988 |
| 2/7-A-13 A | 0,0 | 5 066,0 | - | - | 1994 |
Casing and formation tests
No casing programme is reported for this wellbore.