2/7-A-3 C
Development, productionProducing
Drilled by ConocoPhillips Skandinavia AS with Linus in Eldfisk, 08.12.2024 to 17.03.2025 (99 days), to 6 389,7 m.
Water depth70,7 m
Total depth6 389,7 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table72,4 m
Formation at total depth-
RigLinus
Spud08.12.2024
Completed17.03.2025
OperatorConocoPhillips Skandinavia AS
Position56,3768 N, 3,2660 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Eldfisk gradient | 34,0 °C/km |
| Estimated at total depth from the gradient | 216 °C |
The gradient is the median of 7 released wells in Eldfisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.