2/7-B-4 B
Development, productionPluggedOil
Drilled by ConocoPhillips Skandinavia AS with Eldfisk B in Eldfisk, 15.05.2005 to 14.06.2005 (30 days), to 4 176,0 m.
Water depth71,0 m
Total depth4 176,0 m MD
Vertical depth2 873,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table44,0 m
Formation at total depth-
RigEldfisk B
Spud15.05.2005
Completed14.06.2005
OperatorConocoPhillips Skandinavia AS
Position56,4191 N, 3,2183 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Eldfisk gradient | 34,0 °C/km |
| Estimated at total depth from the gradient | 98 °C |
The gradient is the median of 7 released wells in Eldfisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.