2/7-B-6 A
Development, productionPluggedOil
Drilled by Phillips Petroleum Company Norway with Eldfisk B in Eldfisk, 05.01.2001 to 25.02.2001 (51 days), to 4 572,0 m.
Water depth71,0 m
Total depth4 572,0 m MD
Vertical depth3 033,7 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table42,0 m
Formation at total depth-
RigEldfisk B
Spud05.01.2001
Completed25.02.2001
OperatorPhillips Petroleum Company Norway
Position56,4192 N, 3,2184 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Eldfisk gradient | 34,0 °C/km |
| Estimated at total depth from the gradient | 103 °C |
The gradient is the median of 7 released wells in Eldfisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.