2/7-C-2
Development, productionPlugged and abandonedOil
Drilled by Phillips Petroleum Company Norway with Edda in Edda, 09.03.1979 to 20.05.1979 (72 days), to 3 398,5 m.
Water depth70,0 m
Total depth3 398,5 m MD
Vertical depth3 334,9 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table42,0 m
Formation at total depth-
RigEdda
Spud09.03.1979
Completed20.05.1979
OperatorPhillips Petroleum Company Norway
Position56,4647 N, 3,1045 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Edda gradient | 31,9 °C/km |
| Estimated at total depth from the gradient | 107 °C |
The gradient is the median of 3 released wells in Edda with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.