2/7-NA-1 H
Development, productionClosed
Drilled by ConocoPhillips Skandinavia AS with Linus in Eldfisk, 29.12.2025 to 02.03.2026 (63 days), to 5 643,0 m.
Water depth72,5 m
Total depth5 643,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table62,1 m
Formation at total depth-
RigLinus
Spud29.12.2025
Completed02.03.2026
OperatorConocoPhillips Skandinavia AS
Position56,4246 N, 3,2131 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Eldfisk gradient | 34,0 °C/km |
| Estimated at total depth from the gradient | 191 °C |
The gradient is the median of 7 released wells in Eldfisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/7-NA-2 H | 0,0 | 5 535,2 | - | - | 2024 |
| 2/7-NA-3 H | 0,0 | 4 722,0 | - | - | 2024 |
| 2/7-NA-6 H | 0,0 | 5 559,5 | - | - | 2026 |
| 2/7-NA-5 H | 0,0 | 4 786,6 | - | - | 2023 |
| 2/7-NA-4 Y1H | 0,0 | 5 312,6 | - | - | 2024 |
| 2/7-NA-4 Y2H | 0,0 | 5 274,6 | - | - | 2024 |
| 2/7-NC-3 H | 0,4 | 4 683,9 | - | - | 2025 |
| 2/7-NC-2 H | 0,4 | 4 846,3 | - | - | 2024 |
Casing and formation tests
No casing programme is reported for this wellbore.