2/7-NB-5 H
Development, productionProducing
Drilled by ConocoPhillips Skandinavia AS with West Elara in Eldfisk, 15.06.2023 to 14.07.2023 (29 days), to 4 997,2 m.
Water depth73,0 m
Total depth4 997,2 m MD
Vertical depth2 986,1 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table57,2 m
Formation at total depth-
RigWest Elara
Spud15.06.2023
Completed14.07.2023
OperatorConocoPhillips Skandinavia AS
Position56,4252 N, 3,2267 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Eldfisk gradient | 34,0 °C/km |
| Estimated at total depth from the gradient | 101 °C |
The gradient is the median of 7 released wells in Eldfisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/7-NB-4 H | 0,0 | 5 035,0 | - | - | 2023 |
| 2/7-NB-2 H | 0,0 | 4 602,0 | - | - | 2023 |
| 2/7-NB-1 H | 0,0 | 4 880,0 | - | - | 2023 |
| 2/7-NB-1 Y2H | 0,0 | 4 953,0 | - | - | 2023 |
| 2/7-NB-3 H | 0,0 | 4 145,0 | - | - | 2022 |
| 2/7-U-18 | 0,8 | 122,0 | - | - | 2008 |
| 2/7-U-19 | 0,8 | 137,0 | - | - | 2008 |
| 2/7-U-15 | 0,8 | 106,0 | - | - | 2008 |
Casing and formation tests
No casing programme is reported for this wellbore.