2/7-NC-4 H
Development, injectionInjectingWater
Drilled by ConocoPhillips Skandinavia AS with West Elara in Eldfisk, 30.07.2024 to 01.09.2024 (33 days), to 5 171,8 m.
Water depth71,6 m
Total depth5 171,8 m MD
Vertical depth2 972,5 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table57,2 m
Formation at total depth-
RigWest Elara
Spud30.07.2024
Completed01.09.2024
OperatorConocoPhillips Skandinavia AS
Position56,4285 N, 3,2133 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Eldfisk gradient | 34,0 °C/km |
| Estimated at total depth from the gradient | 101 °C |
The gradient is the median of 7 released wells in Eldfisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/7-NC-5 H | 0,0 | 5 181,6 | - | - | 2024 |
| 2/7-NC-3 H | 0,0 | 4 683,9 | - | - | 2025 |
| 2/7-NC-2 H | 0,0 | 4 846,3 | - | - | 2024 |
| 2/7-NC-1 AH | 0,0 | 4 501,6 | - | - | 2024 |
| 2/7-NC-1 BH | 0,0 | 5 946,7 | - | - | 2024 |
| 2/7-NC-1 H | 0,0 | 5 077,0 | - | - | 2024 |
| 2/7-NA-6 H | 0,4 | 5 559,5 | - | - | 2026 |
| 2/7-NA-5 H | 0,4 | 4 786,6 | - | - | 2023 |
Casing and formation tests
No casing programme is reported for this wellbore.