WellplannerNorwegian shelf well data

Fields / Eldfisk / 2/7-U-25

2/7-U-25

Other, soil drillingPlugged and abandoned

Drilled by ConocoPhillips Skandinavia AS with Bucentaur in Eldfisk, 02.06.2009 to 04.06.2009 (2 days), to 136,0 m.

Water depth73,0 m
Total depth136,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table-
Formation at total depth-
RigBucentaur
Spud02.06.2009
Completed04.06.2009
OperatorConocoPhillips Skandinavia AS
Position56,3733 N, 3,2629 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Eldfisk gradient34,0 °C/km
Estimated at total depth from the gradient6 °C

The gradient is the median of 7 released wells in Eldfisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
2/7-S-400,04 444,0--2019
2/7-S-40 A0,0----
2/7-S-40 Y20,0----
2/7-S-40 Y30,0----
2/7-S-390,04 240,0--2018
2/7-S-350,04 548,0--2019
2/7-S-35 A0,0----
2/7-S-380,04 969,0--2017

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗