Fields / 2/7-U-31
2/7-U-31
Other, soil drillingPlugged and abandoned
Drilled by Phillips Petroleum Company Norway with Bucentaur, 20.06.1998 to 21.06.1998 (1 days), to 106,0 m.
Water depth72,0 m
Total depth106,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table3,0 m
Formation at total depth-
RigBucentaur
Spud20.06.1998
Completed21.06.1998
OperatorPhillips Petroleum Company Norway
Position56,3367 N, 3,0871 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.