Fields / 2/7-U-36
2/7-U-36
Other, soil drillingPlugged and abandoned
Drilled by Phillips Petroleum Company Norway with Bucentaur, 18.10.1997 to 18.10.1997 (0 days), to 176,0 m.
Water depth72,0 m
Total depth176,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table3,0 m
Formation at total depth-
RigBucentaur
Spud18.10.1997
Completed18.10.1997
OperatorPhillips Petroleum Company Norway
Position56,3752 N, 3,2647 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/7-U-37 | 0,0 | 153,0 | - | - | 1997 |
| 2/7-U-20 | 0,1 | 136,0 | - | - | 2009 |
| 2/7-U-23 | 0,2 | 136,0 | - | - | 2009 |
| 2/7-U-21 | 0,2 | 158,0 | - | - | 2009 |
| 2/7-A-18 | 0,2 | 3 727,7 | - | - | 1979 |
| 2/7-A-18 A | 0,2 | 3 090,7 | - | - | 1990 |
| 2/7-A-18 B | 0,2 | 4 308,0 | - | - | 2001 |
| 2/7-A-18 C | 0,2 | 3 239,0 | - | - | 2003 |
Casing and formation tests
No casing programme is reported for this wellbore.