Fields / 2/8-17 A
2/8-17 A
Exploration, wildcatPlugged and abandonedDry
Drilled by Amoco Norway Oil Company with Transocean Nordic, 18.01.1998 to 21.02.1998 (34 days), to 3 145,0 m in the Zechstein Group.
Water depth68,7 m
Total depth3 145,0 m MD
Vertical depth2 852,9 m TVD
Bottom-hole temperature121 °C
Max inclination51,2°
Rotary table41,3 m
Formation at total depthZechstein Group
RigTransocean Nordic
Spud18.01.1998
Completed21.02.1998
OperatorAmoco Norway Oil Company
Position56,4559 N, 3,6014 E
Formations
12 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 121 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 299,0 | 36" | 300,0 | - |
| Surface casing | 13 3/8" | 959,0 | 17 1/2" | 960,0 | - |
| Intermediate | 9 5/8" | 1 690,0 | 12 1/4" | 1 690,0 | - |
| Open hole | - | 2 838,0 | 6" | 2 838,0 | - |
| Liner | 7" | 3 145,0 | 8 1/2" | 3 145,0 | - |
Mud weight
14 measurements, one dot each, 1,60 to 1,81 g/cm³ against measured depth, anco vert.