WellplannerNorwegian shelf well data

Fields / Valhall / 2/8-8

2/8-8

Exploration, appraisalPlugged and abandonedOil

Drilled by Amoco Norway Oil Company with Deepsea Saga in Valhall, 10.11.1975 to 15.03.1976 (126 days), to 2 667,0 m in the Rødby Formation.

Water depth70,0 m
Total depth2 667,0 m MD
Vertical depth-
Bottom-hole temperature77 °C
Max inclination-
Rotary table25,0 m
Formation at total depthRødby Formation
RigDeepsea Saga
Spud10.11.1975
Completed15.03.1976
OperatorAmoco Norway Oil Company
Position56,2805 N, 3,4035 E

Formations

13 tops reported, measured depth in metres.

GroupsNordland Group, top 95,0 mNordland GpHordaland Group, top 1 536,0 mHordaland GpRogaland Group, top 2 409,0 mShetland Group, top 2 447,0 mShetland GpCromer Knoll Group, top 2 619,0 mFormationsBalder Formation, top 2 409,0 mSele Formation, top 2 419,0 mLista Formation, top 2 429,0 mTor Formation, top 2 447,0 mHod Formation, top 2 494,0 mHod FmBlodøks Formation, top 2 601,0 mHidra Formation, top 2 603,0 mRødby Formation, top 2 619,0 m955001 0001 5002 0002 5002 667

Temperature

Reported at total depth77 °C
Valhall gradient29,1 °C/km
Estimated at total depth from the gradient79 °C

The gradient is the median of 8 released wells in Valhall with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
2/8-A-120,63 893,0--1984
2/8-A-12 A0,63 373,0--1984
2/8-A-12 B0,63 657,0--1990
2/8-A-12 C0,63 209,0--2003
2/8-A-30,62 950,0--1982
2/8-A-3 A0,62 794,0--1986
2/8-A-3 B0,62 700,0--1996
2/8-A-3 C0,65 023,0--1998

Casing and formation tests

The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.

StringCasingShoe, mHoleHole depth, mTest, g/cm³
Conductor30"169,036"169,0-
Surface casing20"380,026"388,01,31 LOT
Intermediate13 3/8"1 285,017 1/2"1 295,02,11 LOT
Intermediate9 5/8"2 411,012 1/4"2 419,01,97 LOT
Liner7"2 659,08 1/2"2 667,0-

Mud weight

4 measurements, one dot each, 1,10 to 1,85 g/cm³ against measured depth, waterbased.

1,11,31,51,71,905001 0001 5002 0002 500380,0 m: 1,11 g/cm³, waterbased1 284,0 m: 1,23 g/cm³, waterbased2 410,0 m: 1,80 g/cm³, waterbased2 445,0 m: 1,85 g/cm³, waterbased

Drill-stem tests

Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.

TestInterval, mChokePressureTemp.OilGas
52 460,0 - 2 465,025,4--1 222-
42 488,0 - 2 493,012,5--745-
32 507,0 - 2 515,0---179-
22 556,0 - 2 568,019,0--455-
12 585,0 - 2 595,0-----
Show on the mapOpen on FactPages ↗