WellplannerNorwegian shelf well data

Fields / Valhall / 2/8-A-18

2/8-A-18

Development, productionPlugged and abandonedOil

Drilled by Amoco Norway Oil Company with Valhall in Valhall, 02.05.1985 to 26.06.1985 (55 days), to 4 294,0 m.

Water depth69,0 m
Total depth4 294,0 m MD
Vertical depth2 831,7 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table44,0 m
Formation at total depth-
RigValhall
Spud02.05.1985
Completed26.06.1985
OperatorAmoco Norway Oil Company
Position56,2781 N, 3,3956 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Valhall gradient29,1 °C/km
Estimated at total depth from the gradient83 °C

The gradient is the median of 8 released wells in Valhall with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
2/8-A-18 A same well0,04 456,0--1986
2/8-A-18 B same well0,03 691,0--1989
2/8-A-30,02 950,0--1982
2/8-A-3 A0,02 794,0--1986
2/8-A-3 B0,02 700,0--1996
2/8-A-3 C0,05 023,0--1998
2/8-A-3 D0,04 642,0--1999
2/8-A-240,03 312,0--1988

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗