2/8-A-18
Development, productionPlugged and abandonedOil
Drilled by Amoco Norway Oil Company with Valhall in Valhall, 02.05.1985 to 26.06.1985 (55 days), to 4 294,0 m.
Water depth69,0 m
Total depth4 294,0 m MD
Vertical depth2 831,7 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table44,0 m
Formation at total depth-
RigValhall
Spud02.05.1985
Completed26.06.1985
OperatorAmoco Norway Oil Company
Position56,2781 N, 3,3956 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Valhall gradient | 29,1 °C/km |
| Estimated at total depth from the gradient | 83 °C |
The gradient is the median of 8 released wells in Valhall with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/8-A-18 A same well | 0,0 | 4 456,0 | - | - | 1986 |
| 2/8-A-18 B same well | 0,0 | 3 691,0 | - | - | 1989 |
| 2/8-A-3 | 0,0 | 2 950,0 | - | - | 1982 |
| 2/8-A-3 A | 0,0 | 2 794,0 | - | - | 1986 |
| 2/8-A-3 B | 0,0 | 2 700,0 | - | - | 1996 |
| 2/8-A-3 C | 0,0 | 5 023,0 | - | - | 1998 |
| 2/8-A-3 D | 0,0 | 4 642,0 | - | - | 1999 |
| 2/8-A-24 | 0,0 | 3 312,0 | - | - | 1988 |
Casing and formation tests
No casing programme is reported for this wellbore.