2/8-A-4
Development, productionPlugged and abandonedOil
Drilled by Amoco Norway Oil Company with Valhall in Valhall, 17.12.1982 to 06.07.1984 (567 days), to 2 815,0 m.
Water depth69,0 m
Total depth2 815,0 m MD
Vertical depth2 590,5 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table44,0 m
Formation at total depth-
RigValhall
Spud17.12.1982
Completed06.07.1984
OperatorAmoco Norway Oil Company
Position56,2781 N, 3,3954 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Valhall gradient | 29,1 °C/km |
| Estimated at total depth from the gradient | 76 °C |
The gradient is the median of 8 released wells in Valhall with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/8-A-4 A same well | 0,0 | 2 666,0 | - | - | 1989 |
| 2/8-A-4 B same well | 0,0 | 4 420,0 | - | - | 1995 |
| 2/8-A-17 | 0,0 | 4 065,0 | - | - | 1985 |
| 2/8-A-29 | 0,0 | 4 016,0 | - | - | 1990 |
| 2/8-A-14 | 0,0 | 3 393,5 | - | - | 1984 |
| 2/8-A-14 A | 0,0 | 3 363,0 | - | - | 1989 |
| 2/8-A-14 B | 0,0 | 4 020,0 | - | - | 1992 |
| 2/8-A-5 | 0,0 | 2 940,0 | - | - | 1983 |
Casing and formation tests
No casing programme is reported for this wellbore.