WellplannerNorwegian shelf well data

Fields / Valhall / 2/8-A-8 B

2/8-A-8 B

Development, productionJunked

Drilled by BP Norge AS with Valhall Dp in Valhall, 15.11.2003 to 29.12.2003 (44 days), to 3 056,0 m.

Water depth69,2 m
Total depth3 056,0 m MD
Vertical depth2 436,7 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table43,5 m
Formation at total depth-
RigValhall Dp
Spud15.11.2003
Completed29.12.2003
OperatorBP Norge AS
Position56,2782 N, 3,3955 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Valhall gradient29,1 °C/km
Estimated at total depth from the gradient72 °C

The gradient is the median of 8 released wells in Valhall with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
2/8-A-8 same well0,02 744,0--1983
2/8-A-8 A same well0,02 653,0--1995
2/8-A-8 C same well0,03 235,0--2004
2/8-A-120,03 893,0--1984
2/8-A-12 A0,03 373,0--1984
2/8-A-12 B0,03 657,0--1990
2/8-A-12 C0,03 209,0--2003
2/8-A-110,03 926,0--1984

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗