2/8-C-20
Development, productionClosed
Drilled by Aker BP ASA with Noble Invincible in Valhall, 02.09.2025 to 12.01.2026 (132 days), to 5 472,0 m.
Water depth76,1 m
Total depth5 472,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table62,6 m
Formation at total depth-
RigNoble Invincible
Spud02.09.2025
Completed12.01.2026
OperatorAker BP ASA
Position56,2753 N, 3,3994 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Valhall gradient | 29,1 °C/km |
| Estimated at total depth from the gradient | 159 °C |
The gradient is the median of 8 released wells in Valhall with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.