2/8-C-3
Development, productionClosed
Drilled by Aker BP ASA with Noble Invincible in Valhall, 28.08.2025 to 19.06.2026 (295 days), to 6 240,0 m.
Water depth76,1 m
Total depth6 240,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table62,6 m
Formation at total depth-
RigNoble Invincible
Spud28.08.2025
Completed19.06.2026
OperatorAker BP ASA
Position56,2753 N, 3,3993 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Valhall gradient | 29,1 °C/km |
| Estimated at total depth from the gradient | 182 °C |
The gradient is the median of 8 released wells in Valhall with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.