WellplannerNorwegian shelf well data

Fields / Valhall / 2/8-C-9

2/8-C-9

Development, productionClosed

Drilled by Aker BP ASA with Noble Invincible in Valhall, 08.09.2025 to 03.12.2025 (86 days), to 4 039,0 m.

Water depth76,1 m
Total depth4 039,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table62,6 m
Formation at total depth-
RigNoble Invincible
Spud08.09.2025
Completed03.12.2025
OperatorAker BP ASA
Position56,2752 N, 3,3994 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Valhall gradient29,1 °C/km
Estimated at total depth from the gradient118 °C

The gradient is the median of 8 released wells in Valhall with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
2/8-C-100,0---2025
2/8-C-170,0---2025
2/8-C-180,0---2025
2/8-C-10,0---2025
2/8-C-20,04 591,7--2025
2/8-C-130,03 831,0--2025
2/8-C-190,0---2025
2/8-C-110,04 030,0--2025

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗