2/8-G-23
Development, injectionClosedWater
Drilled by BP Norge AS with Valhall Ip in Valhall, 28.02.2013 to 13.05.2013 (74 days), to 4 270,0 m.
Water depth73,7 m
Total depth4 270,0 m MD
Vertical depth2 572,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table65,3 m
Formation at total depth-
RigValhall Ip
Spud28.02.2013
Completed13.05.2013
OperatorBP Norge AS
Position56,2766 N, 3,3964 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Valhall gradient | 29,1 °C/km |
| Estimated at total depth from the gradient | 75 °C |
The gradient is the median of 8 released wells in Valhall with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.