2/8-G-8 A
Development, productionProducingOil
Drilled by BP Norge AS with Valhall Ip in Valhall, 24.12.2009 to 13.05.2010 (140 days), to 4 592,0 m.
Water depth72,7 m
Total depth4 592,0 m MD
Vertical depth2 553,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table65,3 m
Formation at total depth-
RigValhall Ip
Spud24.12.2009
Completed13.05.2010
OperatorBP Norge AS
Position56,2765 N, 3,3964 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Valhall gradient | 29,1 °C/km |
| Estimated at total depth from the gradient | 74 °C |
The gradient is the median of 8 released wells in Valhall with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.