2/8-V-1
Development, productionClosedOil
Drilled by Aker BP ASA with Noble Integrator in Valhall, 25.07.2019 to 29.10.2026 (2653 days), to 7 107,0 m.
Water depth69,6 m
Total depth7 107,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table70,4 m
Formation at total depth-
RigNoble Integrator
Spud25.07.2019
Completed29.10.2026
OperatorAker BP ASA
Position56,2512 N, 3,3491 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Valhall gradient | 29,1 °C/km |
| Estimated at total depth from the gradient | 207 °C |
The gradient is the median of 8 released wells in Valhall with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/8-V-2 | 0,0 | 5 315,0 | - | - | 2020 |
| 2/8-V-2 Y2 | 0,0 | 6 852,0 | - | - | 2020 |
| 2/8-V-4 | 0,0 | 5 346,0 | - | - | 2020 |
| 2/8-V-4 Y2 | 0,0 | 5 433,0 | - | - | 2020 |
| 2/8-V-5 | 0,0 | 5 284,0 | - | - | 2019 |
| 2/8-V-7 | 0,0 | 5 270,0 | - | - | 2020 |
| 2/8-V-3 | 0,0 | 5 785,0 | - | - | 2019 |
| 2/8-V-6 | 0,0 | 5 089,0 | - | - | 2019 |
Casing and formation tests
No casing programme is reported for this wellbore.