WellplannerNorwegian shelf well data

Fields / Valhall / 2/8-V-1

2/8-V-1

Development, productionClosedOil

Drilled by Aker BP ASA with Noble Integrator in Valhall, 25.07.2019 to 29.10.2026 (2653 days), to 7 107,0 m.

Water depth69,6 m
Total depth7 107,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table70,4 m
Formation at total depth-
RigNoble Integrator
Spud25.07.2019
Completed29.10.2026
OperatorAker BP ASA
Position56,2512 N, 3,3491 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Valhall gradient29,1 °C/km
Estimated at total depth from the gradient207 °C

The gradient is the median of 8 released wells in Valhall with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
2/8-V-20,05 315,0--2020
2/8-V-2 Y20,06 852,0--2020
2/8-V-40,05 346,0--2020
2/8-V-4 Y20,05 433,0--2020
2/8-V-50,05 284,0--2019
2/8-V-70,05 270,0--2020
2/8-V-30,05 785,0--2019
2/8-V-60,05 089,0--2019

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗