Fields / 24/12-2
24/12-2
Exploration, wildcatPlugged and abandonedShows
Drilled by Den norske stats oljeselskap a.s with Dyvi Delta, 23.06.1981 to 21.01.1982 (212 days), to 5 100,0 m in the Heather Formation.
Water depth119,0 m
Total depth5 100,0 m MD
Vertical depth5 091,0 m TVD
Bottom-hole temperature142 °C
Max inclination11,3°
Rotary table32,0 m
Formation at total depthHeather Formation
RigDyvi Delta
Spud23.06.1981
Completed21.01.1982
OperatorDen norske stats oljeselskap a.s
Position59,2002 N, 1,8815 E
Formations
33 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 142 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|
| 24/12-7 | 3,9 | 2 305,0 | 51 °C | 1,50 | 2021 |
| 24/12-8 S | 4,5 | 2 416,0 | - | - | 2024 |
| 24/12-4 | 6,9 | 2 265,0 | 74 °C | 1,35 | 2001 |
| 24/9-2 | 8,1 | 2 743,0 | 69 °C | 1,31 | 1977 |
| 24/9-10 A | 8,8 | 2 900,0 | - | - | 2011 |
| 24/9-10 S | 8,8 | 2 339,0 | - | - | 2011 |
| 24/9-1 | 9,2 | 4 907,0 | 127 °C | 1,79 | 1976 |
| 25/10-6 S | 11,0 | 4 706,0 | 158 °C | 1,95 | 1995 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Conductor | 30" | 199,5 | 36" | 202,5 | - |
| Surface casing | 20" | 992,0 | 26" | 1 005,0 | 1,50 LOT |
| Intermediate | 13 3/8" | 2 873,0 | 17 1/2" | 2 886,0 | 1,79 LOT |
| Intermediate | 9 5/8" | 3 966,0 | 12 1/4" | 3 980,0 | 2,13 LOT |
| Open hole | - | 5 100,0 | 8 1/2" | 5 100,0 | - |
Mud weight
9 measurements, one dot each, 1,00 to 2,03 g/cm³ against measured depth, water based.