WellplannerNorwegian shelf well data

Fields / Alvheim / 24/6-A-1 AY2H

24/6-A-1 AY2H

Development, productionClosedOil

Drilled by Marathon Petroleum Norge AS with DEEPSEA BERGEN decom in Alvheim, 31.08.2007 to 16.09.2007 (16 days), to 5 188,0 m.

Water depth121,0 m
Total depth5 188,0 m MD
Vertical depth2 146,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,0 m
Formation at total depth-
RigDEEPSEA BERGEN decom
Spud31.08.2007
Completed16.09.2007
OperatorMarathon Petroleum Norge AS
Position59,5762 N, 1,9241 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Alvheim gradient31,8 °C/km
Estimated at total depth from the gradient68 °C

The gradient is the median of 6 released wells in Alvheim with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
24/6-A-1 AY1H same well0,05 026,0--2007
24/6-A-1 H same well0,03 627,0--2007
24/6-A-4 H0,04 940,0--2007
24/6-A-2 H0,04 926,0--2008
24/6-A-3 AY1H0,05 209,0--2008
24/6-A-3 AY2H0,05 000,0--2008
24/6-A-3 AY3H0,04 577,0--2008
24/6-A-3 H0,03 150,0--2008

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗