24/9-P-9 H
Development, productionClosedOil
Drilled by Det norske oljeselskap ASA with Transocean Winner in Volund, 02.07.2016 to 21.01.2017 (203 days), to 4 616,0 m.
Water depth124,0 m
Total depth4 616,0 m MD
Vertical depth1 998,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table26,0 m
Formation at total depth-
RigTransocean Winner
Spud02.07.2016
Completed21.01.2017
OperatorDet norske oljeselskap ASA
Position59,4950 N, 1,9669 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Volund gradient | 35,3 °C/km |
| Estimated at total depth from the gradient | 69 °C |
The gradient is the median of 5 released wells in Volund with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 24/9-P-10 AH | 0,0 | 3 272,0 | - | - | 2016 |
| 24/9-P-10 BY1H | 0,0 | 3 777,0 | - | - | 2017 |
| 24/9-P-10 BY2H | 0,0 | 5 069,0 | - | - | 2017 |
| 24/9-P-10 BY3H | 0,0 | 4 232,0 | - | - | 2017 |
| 24/9-P-10 H | 0,0 | 3 448,0 | - | - | 2016 |
| 24/9-P-7 AH | 0,0 | 4 658,0 | - | - | 2016 |
| 24/9-P-7 H | 0,0 | 3 248,0 | - | - | 2016 |
| 24/9-P-8 AY1H | 0,0 | 6 086,0 | - | - | 2016 |
Casing and formation tests
No casing programme is reported for this wellbore.