Exploration, wildcatPlugged and abandonedOil and gas
Drilled by Elf Petroleum Norge AS with Pentagone 81 in Frigg, 30.03.1971 to 22.07.1971 (114 days), to 4 570,0 m in the Hugin Formation.
Water depth101,0 m
Total depth4 570,0 m MD
Vertical depth-
Bottom-hole temperature98 °C
Max inclination4,2°
Rotary table24,0 m
Formation at total depthHugin Formation
RigPentagone 81
Spud30.03.1971
Completed22.07.1971
OperatorElf Petroleum Norge AS
Position59,8882 N, 2,0785 E
Formations
26 tops reported, measured depth in metres.
Temperature
Reported at total depth
98 °C
Frigg gradient
23,0 °C/km
Estimated at total depth from the gradient
106 °C
The gradient is the median of 7 released wells in Frigg with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.