25/1-14
Exploration, wildcatPluggedOil and gas
Drilled by Aker BP ASA with Deepsea Stavanger in Fulla, 06.05.2025 to 23.05.2025 (17 days), to 2 250,0 m.
Water depth111,6 m
Total depth2 250,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table30,0 m
Formation at total depth-
RigDeepsea Stavanger
Spud06.05.2025
Completed23.05.2025
OperatorAker BP ASA
Position59,8990 N, 2,2689 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Fulla gradient | 34,7 °C/km |
| Estimated at total depth from the gradient | 77 °C |
The gradient is the median of 5 released wells in Fulla with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/1-14 A same well | 0,0 | 10 410,0 | - | - | 2025 |
| 25/1-14 B same well | 0,0 | 7 428,0 | - | - | 2025 |
| 25/1-14 C same well | 0,0 | 10 665,0 | - | - | 2025 |
| 25/1-14 D same well | 0,0 | 10 065,0 | - | - | 2025 |
| 25/1-14 E same well | 0,0 | 5 501,0 | - | - | 2025 |
| 25/1-14 F same well | 0,0 | 6 763,0 | - | - | 2025 |
| 25/1-14 G same well | 0,0 | 10 444,0 | - | - | 2025 |
| 25/1-U-1 | 0,0 | 1 050,0 | - | - | 2025 |
Casing and formation tests
No casing programme is reported for this wellbore.