Fields / Nordøst Frigg / 25/1-4
25/1-4
Exploration, wildcatPlugged and abandonedOil and gas
Drilled by Elf Petroleum Norge AS with Deepsea Driller in Nordøst Frigg, 01.04.1974 to 30.05.1974 (59 days), to 2 795,0 m in the Hardråde Formation.
Formations
10 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 76 °C |
1 released well in Nordøst Frigg report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/1-B-1 H | 1,7 | 1 982,0 | - | - | 1982 |
| 25/1-B-2 H | 1,7 | 2 006,0 | - | - | 1982 |
| 25/1-B-3 H | 1,7 | 2 041,0 | - | - | 1982 |
| 25/1-B-4 H | 1,7 | 1 982,0 | - | - | 1981 |
| 25/1-B-5 H | 1,7 | 2 031,0 | - | - | 1982 |
| 25/1-B-6 H | 1,7 | 2 029,0 | - | - | 1982 |
| 25/1-B-7 H | 1,7 | 2 009,0 | - | - | 1982 |
| 30/11-F-3 H | 5,9 | - | - | - | 2026 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 164,0 | 36" | 166,0 | - |
| Intermediate | 13 3/8" | 424,0 | 17 1/2" | 425,0 | - |
| Intermediate | 9 5/8" | 1 907,0 | 12 1/4" | 1 910,0 | - |
| Liner | 7" | 2 795,0 | 8 1/2" | 2 795,0 | - |
Mud weight
5 measurements, one dot each, 1,20 to 1,38 g/cm³ against measured depth, water based.
Drill-stem tests
Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.
| Test | Interval, m | Choke | Pressure | Temp. | Oil | Gas |
|---|---|---|---|---|---|---|
| 1 | 1 969,0 - 1 995,0 | 19,0 | - | - | 5 | 610 000 |