25/1-A-17
Development, productionPlugged and abandonedGas
Drilled by Elf Petroleum Norge AS with Frigg Dp2 in Frigg, 28.12.1977 to 17.07.1978 (201 days), to 2 031,0 m.
Water depth98,0 m
Total depth2 031,0 m MD
Vertical depth1 925,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table43,0 m
Formation at total depth-
RigFrigg Dp2
Spud28.12.1977
Completed17.07.1978
OperatorElf Petroleum Norge AS
Position59,8860 N, 2,0727 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Frigg gradient | 23,0 °C/km |
| Estimated at total depth from the gradient | 45 °C |
The gradient is the median of 7 released wells in Frigg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.